- Level: Advanced
- Format: Live online · In-center
- Duration: 24 hours
- Standards: FIDIC 2017 Red Book, FIDIC 2017 Yellow Book, NEC4 Engineering and Construction Contract, AIA A201-2017, SCL Delay and Disruption Protocol, AACE RP 29R-03
Course Overview
Most construction disputes are won or lost on the contract, not on the engineering. This advanced course compares the three families of standard forms that engineers and managers are most likely to meet: the FIDIC 2017 suite used on international projects, the NEC4 suite widely used in the UK, and the AIA documents common in the United States.
Participants learn how each form allocates risk, handles notices, variations and payment, and deals with delay and disruption. The second half of the course focuses on claims: building a well-evidenced extension of time or loss-and-expense claim, understanding recognized delay analysis methods, and responding to claims from the employer's side. The course is taught from an engineering and commercial perspective and does not constitute legal advice.
Who Should Attend
- Project managers, contract administrators and commercial managers
- Planners and quantity surveyors involved in delay and cost claims
- Engineers acting as FIDIC Engineer or NEC Project Manager
- Client-side representatives who review contractor claims
Learning Outcomes
On completion of this course, participants will be able to:
- Compare risk allocation under FIDIC, NEC4 and AIA standard forms
- Administer notices, time bars and variations correctly
- Explain compensation events and early warnings under NEC4
- Identify entitlement to extension of time and additional cost
- Describe common delay analysis methods and when to use them
- Structure a claim document with a clear narrative and evidence trail
- Outline dispute avoidance and resolution routes, from DAABs to adjudication
Course Modules
- Module 1: Contract Fundamentals – Formation, contract documents, order of precedence and procurement routes.
- Module 2: FIDIC 2017 Suite – Red, Yellow and Silver Books, the role of the Engineer and key clauses.
- Module 3: NEC4 Contracts – Main and secondary options, early warnings, compensation events and programme management.
- Module 4: AIA Documents – A201 general conditions, owner-architect-contractor relationships and change directives.
- Module 5: Variations and Payment – Valuation of variations, interim payments and final accounts.
- Module 6: Delay and Disruption – Concurrency, float ownership and the SCL Protocol.
- Module 7: Delay Analysis Methods – As-planned vs. as-built, time impact analysis and windows analysis per AACE RP 29R-03.
- Module 8: Preparing and Responding to Claims – Notices, records, quantum and claim presentation.
- Module 9: Dispute Resolution – Negotiation, DAABs, adjudication, mediation and arbitration.
Assessment & Certification
Assessment is based on a written clause-interpretation exercise and a group claim preparation and response workshop. Participants who meet the attendance and assessment requirements receive an IACEA Certificate of Completion that records the course title, training hours and completion date, and carries a unique serial number that employers and clients can verify online.
Prerequisites
At least two years of experience on construction projects. Familiarity with basic scheduling concepts is recommended.