Engineering Software

Primavera P6 Professional: Construction Planning and Control

Build, resource, baseline and update construction schedules in Primavera P6, with earned value tracking and schedule quality checks that clients and auditors expect.

Primavera P6 Professional: Construction Planning and Control
  • Level: Intermediate
  • Format: Live online · In-center
  • Duration: 32 hours
  • Software: Oracle Primavera P6 Professional, Microsoft Project
  • Standards: PMI PMBOK Guide, AACE International Recommended Practices, DCMA 14-Point Schedule Assessment

Course Overview

Oracle Primavera P6 is the scheduling platform of choice on large construction and infrastructure projects. This course teaches participants to build schedules that are logical, realistic and easy to update, and to use them actively to control a project rather than simply report on it.

Working on a construction case study, participants create the enterprise structure, WBS and activities, define logic and calendars, assign resources and costs, and calculate the critical path. They then set a baseline, record progress, analyze variances and earned value, and prepare reports. Schedule quality is reviewed using criteria commonly drawn from the DCMA 14-point assessment, and the course compares P6 workflows with Microsoft Project for teams that use both.

Who Should Attend

  • Planners and schedulers on construction projects
  • Project and site engineers responsible for progress reporting
  • Project control and cost engineers
  • Client-side reviewers of contractor programs

Learning Outcomes

On completion of this course, participants will be able to:

  • Set up EPS, OBS, projects, WBS and calendars in P6
  • Create activities with sound logic, lags and constraints
  • Calculate and interpret the critical path and float
  • Assign and level resources and costs
  • Create baselines and update progress
  • Analyze variances and earned value metrics
  • Assess schedule quality and produce clear layouts and reports

Course Modules

  • Module 1: Planning Concepts – CPM, schedule types and the planner's role.
  • Module 2: P6 Structure – EPS, OBS, projects, WBS and codes.
  • Module 3: Activities and Logic – Activity types, relationships, lags and constraints.
  • Module 4: Calendars and Scheduling – Calendars, scheduling options and the critical path.
  • Module 5: Resources and Costs – Resource dictionary, assignments, curves and leveling.
  • Module 6: Baselines and Updating – Baselines, progress updates and data date.
  • Module 7: Earned Value and Analysis – EV, SPI, CPI and variance reporting.
  • Module 8: Schedule Quality – Quality checks, DCMA 14-point concepts and common errors.
  • Module 9: Layouts and Reports – Filters, groupings, Gantt layouts and exports.

Assessment & Certification

Participants build, baseline and update a complete project schedule and submit a progress report with earned value analysis. Participants who meet the attendance and assessment requirements receive an IACEA Certificate of Completion that records the course title, training hours and completion date, and carries a unique serial number that employers and clients can verify online.

Prerequisites

A basic understanding of construction sequences. The IACEA Construction Project Management Essentials course is recommended but not required.

Continue learning